Pump Station Commissioning
Full system inspection
Levels inspection
Manway check for obstruction
Mount control panel (if not in place)
Check correct load to panel
Check correct cable size
Check correct power supply
Set the overloads
Lower pumps via guiderail onto stools using an A-frame if required
Pull pump cables through ducting
Pull float cables through ducting
Set floats to correct operating position
Wire cables into control panel
Fill system with water
Full test of pump station
Sign-off and certification
Warranty and documentation provided